No Welding Required
Assemble Stanchions and panels using TORX stainless steel grub screes instead of welding. No hot works permits needed.
Adjustable During Installation
The flexibility of Monowills Link during installation, allows for quick adjustments to be made, reducing risks of non-fitments compared with a traditional pre-fabricated barrier.
Reduce Freight
Link can be transported in easy to manage & labelled boxes.
Save on logistic costs, compared with transporting fully fabricated systems.
No Post Manufacture Galvanising Required
All items provided pre-galvanized, ready to install.
TORX Grub Screws (Primary Fixing)
Link uses TORX head stainless steel grub screws for superior corrosion and vandalism resistance supplied as standard.
Added Security (2nd Optional Fixing)
Link components have a 7mm hole at the rear of each piece for a self driving screw, for those who want added security.
Anti Vibration Screw (3rd Optional Fixing)
The Link grub screw allows a self driving screw to pass neatly through the centre, physically pinning the grub screw in place. Perfect for scenarios when vibration may be a factor.
Casting Strength
Malleable Iron with a min 350 Mpa
Proven Quality
All Monowills products set the industry benchmark for quality.
Monowills Link components and barrier configurations, have been tested & independently certified.